Our services
Construction
Building wind turbines and site infrastructure for grid-connected energy generation.
Overview
What we deliver
From foundation to first rotation, Ultra Wind Energy supports wind farm construction across Europe — civil works, transport logistics, crane operations, tower erection, and grid connection under one coordinated team.
Outcome: A grid-connected asset delivered on schedule with the documentation package the owner needs for handover.
Scope of work
- Site preparation, access roads, and crane pads
- Reinforced concrete foundations and cable trenches
- Tower, nacelle, and rotor erection with heavy-lift cranes
- Medium- and high-voltage cabling and substation works
- Commissioning, SCADA integration, and grid handover
How we work
Our process
Survey & planning
Geotechnical study, logistics review, and permit alignment.
Civil works
Foundations poured to IEC and manufacturer tolerances.
Erection
Coordinated lifts by trained crane and rigging teams.
Commissioning
End-to-end tests, LOTO, and handover documentation.
Project enquiry
Request an estimate for construction
Related projects

73.5 MW Wind Park — Project Development
Development of a 73.5 MW wind park in Pagėgiai, Lithuania, comprising 30 wind turbines. Developed 2010–2012, currently operating.
Read the 73.5 MW Wind Park — Project Development case study
Enercon E66 Recommissioning in Telšiai
Installation and recommissioning of a refurbished used Enercon E66 wind turbine in Telšiai, Lithuania — the turbine was given a second operational life.
Read the Enercon E66 Recommissioning in Telšiai case studyDiscuss a construction project
Share your site and scope — our team replies within one working day.
Request a construction estimate


