Our services
Disassembling
Controlled dismantling of turbines for repowering, resale or recycling.
Overview
What we deliver
End-of-life or repowering — we dismantle turbines under controlled conditions, with material segregated for resale or recycling.
Outcome: Site cleared, materials segregated for recycling, and chain-of-custody documentation supplied.
Scope of work
- Method statement and lift plan approval
- Fluid drainage and hazardous-material handling
- Controlled crane-down of rotor, nacelle, and tower
- Foundation removal and site reinstatement
- Segregated recycling of steel, copper, and composites
How we work
Our process
Plan
HSE dossier, exclusion zones, and neighbour communication.
Prep
De-energise, drain fluids, remove hazardous components.
Dismantle
Reverse-erection sequence with certified crane crews.
Restore
Site returned per landowner and permit requirements.
Project enquiry
Request an estimate for disassembling
Related projects

Dismantling of Eight Enercon E66 Turbines in Dorna
Professional dismantling of eight Enercon E66 wind turbines in Dorna, Germany, preparing the location for modern wind-energy development.
Read the Dismantling of Eight Enercon E66 Turbines in Dorna case study
Decommissioning of Six AN Bonus Turbines
Decommissioning of six AN Bonus wind turbines in Büttel — four AN Bonus 600 and two AN Bonus 450 — and preparation of the site for newer wind-energy assets.
Read the Decommissioning of Six AN Bonus Turbines case study
Dismantling of Five Turbines in Feldheim
Dismantling of five wind turbines in Feldheim, Germany — four Enercon E66 and one BWU turbine — to prepare the location for future energy projects.
Read the Dismantling of Five Turbines in Feldheim case studyDiscuss a disassembling project
Share your site and scope — our team replies within one working day.
Request a disassembling estimate


