Dismantling
Dismantling of Five Turbines in Feldheim
Feldheim, Germany
Dismantling of five wind turbines in Feldheim, Germany — four Enercon E66 and one BWU turbine — to prepare the location for future energy projects.
- Location
- Feldheim, Germany
- Service
- Dismantling
- Manufacturer
- Enercon
- Turbines
- 5
Fleet composition: 4 × Enercon E66, 1 × BWU.
Project Overview
Background & work performed
Ultra Wind Energy dismantled five wind turbines in Feldheim, Germany: four Enercon E66 units and one BWU turbine. The work removed the existing turbines and prepared the location for future energy projects.
Scope of Work
Work stages
- 1
Dismantling of four Enercon E66 turbines
- 2
Dismantling of one BWU turbine
- 3
Preparation of the location for future energy projects
The Challenge
The site combined two different turbine platforms that both needed to be taken out of service and removed so the location could be used for future energy projects.
Our Solution
Our team dismantled the four Enercon E66 turbines and the single BWU turbine, and cleared the location so it was ready for future energy development.
Media Gallery
On-site imagery
Project Location
Feldheim, Germany
Project Enquiry
Request a Project Estimate
Share a few details and our team will reply with next steps.
Related projects

Dismantling of Eight Enercon E66 Turbines in Dorna
Professional dismantling of eight Enercon E66 wind turbines in Dorna, Germany, preparing the location for modern wind-energy development.
Read the Dismantling of Eight Enercon E66 Turbines in Dorna case study
Dismantling of Four Enercon E66 Wind Turbines
Dismantling of four Enercon E66 wind turbines in Lasbek, Germany.
Read the Dismantling of Four Enercon E66 Wind Turbines case study
Decommissioning of Six AN Bonus Turbines
Decommissioning of six AN Bonus wind turbines in Büttel — four AN Bonus 600 and two AN Bonus 450 — and preparation of the site for newer wind-energy assets.
Read the Decommissioning of Six AN Bonus Turbines case study