Project Overview

Background & work performed

Ultra Wind Energy carried out the decommissioning of six AN Bonus wind turbines in Büttel, Germany — four AN Bonus 600 units and two AN Bonus 450 units. The scope covered planning, dismantling logistics, the physical dismantling of the six turbines, removal of the dismantled equipment and preparation of the site for newer wind-energy assets.

Scope of Work

Work stages

  1. 1

    Dismantling planning

  2. 2

    Logistics planning

  3. 3

    Dismantling of six AN Bonus turbines (4 × 600, 2 × 450)

  4. 4

    Removal of the dismantled equipment

  5. 5

    Site preparation for newer wind-energy assets

The Challenge

Removing a mixed fleet of six older turbines and clearing the location for future wind-energy assets required coordinated dismantling planning and organised logistics for the removed equipment.

Our Solution

Our team prepared the dismantling and logistics plans, dismantled the six turbines, removed the equipment from site and left the location ready for the next generation of wind-energy assets.

Media Gallery

On-site imagery

Project Location

Büttel, Germany

Open in Google Maps

Project Enquiry

Request a Project Estimate

Share a few details and our team will reply with next steps.

Similar-project reference: Decommissioning of Six AN Bonus Turbines

Service delivered

Disassembling

Explore disassembling